Legend

Terminal Station
Substation
Existing wind farm
Committed wind farm (contracted)
Committed solar farm (contracted)

Available indicative generation capacity (MW)

10
30
50
135

General Notes

Select line, terminal station or generator for info.

Information is indicative only, system normal.

Load includes the effect of existing generation.

Line impedance is in per unit on 100MVA base.


Last updated: June 2017.

Data period: 1st April 2015 – 1st April 2016.